IDOT I290 at Des Plaines Received Contractor of the Year Award in 2009 for this Project
Reyes Group Ltd. was responsible for the implementation and general supervision of the following project totaling approximately $2,000,000: Work consisted of drainage improvements, which included new sewer, retaining and barrier wall construction along with the replacement of an existing overhead sign structure.
Scope of Work Includes:
- Traffic Control and Temporary Road Closures
- Asphalt Paving
- Concrete Paving
- Concrete Retaining Walls and Barrier Walls
- Rebar Installation
- Sewer Modifications
- Boring of Casing Pipe
- Striping
- Landscaping
- Overhead Signage and Structures
- Electrical