Reyes Group Ltd was selected as a General Contractor to perform following work at the North Airfield 9L-27R:
- Approximately 7,900 LF of fence removal
- Construction of 18,000 SF of wildlife deterrent slab
- Installation of granular subbase including subgrade excavation/preparation
- Upgrade existing slide gate operators and pulling mechanism
- Installation of new Type C (6 foot) fence
- Temporary erosion control
- Restoration and seeding of all disturbed work areas
- Clearing and grubbing of some areas