John H. Stroger Jr. Hospital, Chicago, Illinois
Reyes Group Ltd is directly responsible for the implementation and general supervision of the following project totaling approximately $500,000: Temporary waterproof enclosures between areas of the building, which are to be demolished, and those areas which are to be saved. Installation of concrete, structural steel and masonry to seal the building to be saved. Site utility and site restoration.
Scope of Work Includes:
- Excavation
- C-I-P Foundations
- Masonry
- Structural Steel
- Rough Carpentry
- Site Utilities
- Waterproofing
- Asphalt Paving
- Site Concrete